On Sat, May 22, 2010 at 4:33 PM, Matthew Gabeler-Lee
<cheetah@fastcat.org> wrote:
> I'm trying to customize an existing pgAgent job by adding some steps, one of
> which needs to run before the existing step. Unfortunately this doesn't
> seem to be possible without re-creating the job from scratch.
>
> It appears that the order is determined simply by the job step table's PK.
> Since the foriegn key from the step log table doesn't have an "on update
> cascade" clause, nor is it deferrable, the ID of existing jobs that have run
> at least once can't be changed.
Steps are ordered by their name - pgAgent does something like SELECT
steps FROM steptable ORDER BY stepname, so ordering will be per the
locale of your database.
--
Dave Page
EnterpriseDB UK: http://www.enterprisedb.com
The Enterprise Postgres Company