Thread: 9.2 final
So, when are we thinking we might release 9.2.0? We've done a fall release the last two years, but it's not obvious to me that we have a whole lot of blockers left. In fact, the only blocker for which we have nothing that looks like a fix at present seems to be this: http://archives.postgresql.org/message-id/17129.1331607036@sss.pgh.pa.us -- Robert Haas EnterpriseDB: http://www.enterprisedb.com The Enterprise PostgreSQL Company
On Mon, Jun 11, 2012 at 8:39 PM, Robert Haas <robertmhaas@gmail.com> wrote: > So, when are we thinking we might release 9.2.0? > > We've done a fall release the last two years, but it's not obvious to > me that we have a whole lot of blockers left. In fact, the only > blocker for which we have nothing that looks like a fix at present > seems to be this: > > http://archives.postgresql.org/message-id/17129.1331607036@sss.pgh.pa.us > > -- > Robert Haas > EnterpriseDB: http://www.enterprisedb.com > The Enterprise PostgreSQL Company > > -- > Sent via pgsql-hackers mailing list (pgsql-hackers@postgresql.org) > To make changes to your subscription: > http://www.postgresql.org/mailpref/pgsql-hackers I am eagerly waiting for the release!!!(Excuse me if I am over-excited,but this is the first release for me as a community member. Atri -- Regards, Atri l'apprenant
Robert Haas <robertmhaas@gmail.com> wrote: > So, when are we thinking we might release 9.2.0? > > We've done a fall release the last two years, but it's not obvious > to me that we have a whole lot of blockers left. I'm working on getting all of our triggers to behave with Tom's v8 patch for bug 6123 and hope to be able to post a positive result tomorrow. I think this is considered a bug and still subject to inclusion, but it doesn't really cause my shop any pain if it is bumped to 9.3. In other words, I don't think this is a blocker. http://archives.postgresql.org/message-id/9698.1327266271@sss.pgh.pa.us -Kevin
Robert, Hmmm. I was assuming September, given how late the beta came out, and that nobody has previously talked seriously abouta June release. I'll also point out that while there's a beta2 tarball, there was no announcement and no packages forit. If we decide to do June, then PR will be minimal because I was assuming I had another 7 weeks to prepare it. Not that thatshould be the deciding factor (it would be great to get out an early release and get it out of the way) but it shouldbe taken into consideration. ----- Original Message ----- > So, when are we thinking we might release 9.2.0? > > We've done a fall release the last two years, but it's not obvious to > me that we have a whole lot of blockers left. In fact, the only > blocker for which we have nothing that looks like a fix at present > seems to be this: > > http://archives.postgresql.org/message-id/17129.1331607036@sss.pgh.pa.us > > -- > Robert Haas > EnterpriseDB: http://www.enterprisedb.com > The Enterprise PostgreSQL Company > > -- > Sent via pgsql-hackers mailing list (pgsql-hackers@postgresql.org) > To make changes to your subscription: > http://www.postgresql.org/mailpref/pgsql-hackers >
On Mon, Jun 11, 2012 at 6:02 PM, Joshua Berkus <josh@agliodbs.com> wrote: > Robert, > > Hmmm. I was assuming September, given how late the beta came out, and that nobody has previously talked seriously abouta June release. I'll also point out that while there's a beta2 tarball, there was no announcement and no packages forit. There were packages the following day (well, installers at least), but they're the first builds from a new build environment, so I don't exactly trust them yet - I'd want at least one more beta and an RC. -- Dave Page Blog: http://pgsnake.blogspot.com Twitter: @pgsnake EnterpriseDB UK: http://www.enterprisedb.com The Enterprise PostgreSQL Company
On 11 June 2012 18:02, Joshua Berkus <josh@agliodbs.com> wrote: > Hmmm. I was assuming September, given how late the beta came out, and that nobody has previously talked seriously abouta June release. I'll also point out that while there's a beta2 tarball, there was no announcement and no packages forit. > > If we decide to do June, then PR will be minimal because I was assuming I had another 7 weeks to prepare it. Not thatthat should be the deciding factor (it would be great to get out an early release and get it out of the way) but it shouldbe taken into consideration. Not really sure why we're discussing it. We've always had a long beta cycle and this seems to cut it very short at both ends. If we're going to have a fixed cutoff date for patches then having a variable release date seems weird, unless it is to elongate it to fix bugs. Let me put it this way: is there a benefit to changing the plan? Anyone desperate for the new features is already using them, and we're relying upon that to throw up bugs during beta. -- Simon Riggs http://www.2ndQuadrant.com/ PostgreSQL Development, 24x7 Support, Training & Services
On Tue, Jun 12, 2012 at 09:38:54AM +0100, Simon Riggs wrote: > On 11 June 2012 18:02, Joshua Berkus <josh@agliodbs.com> wrote: > > > Hmmm. I was assuming September, given how late the beta came out, > > and that nobody has previously talked seriously about a June > > release. I'll also point out that while there's a beta2 tarball, > > there was no announcement and no packages for it. > > > > If we decide to do June, then PR will be minimal because I was > > assuming I had another 7 weeks to prepare it. Not that that > > should be the deciding factor (it would be great to get out an > > early release and get it out of the way) but it should be taken > > into consideration. > > > Not really sure why we're discussing it. > > We've always had a long beta cycle and this seems to cut it very > short at both ends. I'm not sure I understand how having a long beta cycle is a good thing, or even whether you're saying it is. Could you please clarify? > If we're going to have a fixed cutoff date for patches then having a > variable release date seems weird, unless it is to elongate it to fix > bugs. > > Let me put it this way: is there a benefit to changing the plan? Sure. If it's ready to go, there's no point holding it back. Downstream projects get a little extra integration time, etc. > Anyone desperate for the new features is already using them, and we're > relying upon that to throw up bugs during beta. I'm always grateful to those brave souls who "go there" with versions of PostgreSQL that aren't even beta. They're a big chunk of why it might well be OK to step toward this major release :) Cheers, David. -- David Fetter <david@fetter.org> http://fetter.org/ Phone: +1 415 235 3778 AIM: dfetter666 Yahoo!: dfetter Skype: davidfetter XMPP: david.fetter@gmail.com iCal: webcal://www.tripit.com/feed/ical/people/david74/tripit.ics Remember to vote! Consider donating to Postgres: http://www.postgresql.org/about/donate
On Mon, Jun 11, 2012 at 1:02 PM, Joshua Berkus <josh@agliodbs.com> wrote: > If we decide to do June, then PR will be minimal because I was assuming I had another 7 weeks to prepare it. Not thatthat should be the deciding factor (it would be great to get out an early release and get it out of the way) but it shouldbe taken into consideration. Well, so far, enthusiasm for getting a release out sooner than the fall seems pretty limited. Barring an uptick in enthusiasm, I think you're going to get your 7 weeks. Personally, I like getting releases out the door sooner, because then people can start using the features sooner. And that's the whole point, isn't it? But with no PR and no installers it won't be much of a "release", so I think we have to wait. We might want to try to start putting together some dates for beta3 and/or rc1, though, even if they're a bit further out, so that the people who have to do work around that can know what dates they're trying to hit. -- Robert Haas EnterpriseDB: http://www.enterprisedb.com The Enterprise PostgreSQL Company
Simon Riggs <simon@2ndQuadrant.com> writes: > Let me put it this way: is there a benefit to changing the plan? The plan is, and always has been, "we'll release when it's ready". We generally suppose that a release is ready when the rate of bug reports against the beta has dropped off substantially. It's certainly absurd to claim that 9.2 has reached that stage. Personally I'd very much like to see 9.2 out before the fall, mainly because I'd like to get it into Fedora 18 (which would require 9.2.0 to be out by early September at the latest). But getting it out in June would require abandoning every standard for release quality we've ever had. regards, tom lane
On Tue, Jun 12, 2012 at 4:08 PM, Tom Lane <tgl@sss.pgh.pa.us> wrote: > Simon Riggs <simon@2ndQuadrant.com> writes: >> Let me put it this way: is there a benefit to changing the plan? > > The plan is, and always has been, "we'll release when it's ready". > We generally suppose that a release is ready when the rate of bug > reports against the beta has dropped off substantially. It's certainly > absurd to claim that 9.2 has reached that stage. > > Personally I'd very much like to see 9.2 out before the fall, mainly > because I'd like to get it into Fedora 18 (which would require 9.2.0 > to be out by early September at the latest). But getting it out in > June would require abandoning every standard for release quality we've > ever had. Yeah, I don't hink that's reasonable at all. And it doesn't make sense to release in july or at least first half of august due to vacations. Maybe all of august. Which has us in early september anyway. But if we believe we've taken care of all known open issues fairly soon, getting an RC out rather than a beta before people go on vacation would probably be a good thing... -- Magnus Hagander Me: http://www.hagander.net/ Work: http://www.redpill-linpro.com/
> But if we believe we've taken care of all known open issues fairly > soon, getting an RC out rather than a beta before people go on > vacation would probably be a good thing... Yeah, that's the other reason I'm not so wild about a June release; I have a whole list of tests I want to do against beta2, and to date I've done none of them. -- Josh Berkus PostgreSQL Experts Inc. http://pgexperts.com
"Kevin Grittner" <Kevin.Grittner@wicourts.gov> wrote: > I'm working on getting all of our triggers to behave with Tom's v8 > patch for bug 6123 and hope to be able to post a positive result > tomorrow. I think this is considered a bug and still subject to > inclusion, but it doesn't really cause my shop any pain if it is > bumped to 9.3. In other words, I don't think this is a blocker. Testing has run into problems, the cause of which is not immediately obvious. I think we should bump this to 9.3. Our shop has a workaround which isn't drawing any complaints here, and the issue has been around forever in its current form. I'm not even sure we won't need more discussion on what constitutes correct behavior once I track things down. Any objections? -Kevin
"Kevin Grittner" <Kevin.Grittner@wicourts.gov> writes: > "Kevin Grittner" <Kevin.Grittner@wicourts.gov> wrote: >> I'm working on getting all of our triggers to behave with Tom's v8 >> patch for bug 6123 and hope to be able to post a positive result >> tomorrow. I think this is considered a bug and still subject to >> inclusion, but it doesn't really cause my shop any pain if it is >> bumped to 9.3. In other words, I don't think this is a blocker. > Testing has run into problems, the cause of which is not immediately > obvious. I think we should bump this to 9.3. Our shop has a > workaround which isn't drawing any complaints here, and the issue > has been around forever in its current form. I'm not even sure we > won't need more discussion on what constitutes correct behavior once > I track things down. Agreed. Even if we were entirely happy with the design of the patch (which, from the previous discussion, we weren't 100%) and your testing gave it a clean bill of health, it's uncomfortable to be pushing such a change into 9.2 post-beta --- it might invalidate other peoples' application compatibility checking, which I'm sure people have started doing using the betas. Punting to 9.3 seems like the thing to do. regards, tom lane