All,
Per request, I've drafted a "release timeline" which shows the timings and
order in which everything needs to be done. It obviously doesn't have quite
enough detail on the stuff which needs to be done over the last 4 days before
the release. Help me fill it in?
http://developer.postgresql.org/index.php/MajorReleaseTimeline
--
Josh Berkus
PostgreSQL @ Sun
San Francisco