Re: pgadmin 1.8.4 pgagent schedule issue - Mailing list pgadmin-support

From susan.williams@us.michelin.com
Subject Re: pgadmin 1.8.4 pgagent schedule issue
Date
Msg-id OFAA23F7A3.DF1411A0-ON852574D6.005CFE91-852574D6.005D8D6D@michelin.com
Whole thread Raw
In response to Re: pgadmin 1.8.4 pgagent schedule issue  ("Dave Page" <dpage@pgadmin.org>)
Responses Re: pgadmin 1.8.4 pgagent schedule issue  ("Dave Page" <dpage@pgadmin.org>)
List pgadmin-support
<br /><font face="sans-serif" size="2">Dave - I added comments; but, it still doesn't recognize the date even though it
isthere.  The date in the start date field is 10/03/08.  I tried using the format you used below.  When I manually
typedin the date 10/03/2008, it removed the visible date from the field.</font><br /><br /><font face="sans-serif"
size="2">SusanWilliams<br /> Michelin North America<br /> 1401 Antioch Church Road<br /> Greenville, SC  29605<br />
IS/US1<br/> Phone: 864-458-1455 (internal: x71455 or 787-1455) <br /><br /> D3 – Michelin Restricted<br /> Retention:
201-101< 90 Days <br /></font><br /><br /><br /><table width="100%"><tr valign="top"><td width="40%"><font
face="sans-serif"size="1"><b>"Dave Page" <dpage@pgadmin.org></b> </font><p><font face="sans-serif"
size="1">10/02/0812:01</font></td><td width="59%"><table width="100%"><tr valign="top"><td><div align="right"><font
face="sans-serif"size="1">To</font></div></td><td><font face="sans-serif"
size="1">susan.williams@us.michelin.com</font></td></tr><trvalign="top"><td><div align="right"><font face="sans-serif"
size="1">cc</font></div></td><td><fontface="sans-serif" size="1">pgadmin-support@postgresql.org</font></td></tr><tr
valign="top"><td><divalign="right"><font face="sans-serif" size="1">Subject</font></div></td><td><font
face="sans-serif"size="1">Re: [pgadmin-support] pgadmin 1.8.4 pgagent schedule issue</font></td></tr></table><br
/><table><trvalign="top"><td></td><td></td></tr></table><br /></td></tr></table><br /><br /><br /><tt><font size="2">On
Thu,Oct 2, 2008 at 4:21 PM,  <susan.williams@us.michelin.com> wrote:<br /> ><br /> > I am experiencing an
issuewith pgadmin 1.8.4 (Windows).  The issue is with<br /> > the pgagent job scheduler.  I am able to create new
jobsand steps.<br /> >  However, I am unable to create a new schedule.  I am also unable to edit /<br /> > change
aschedule that currently exist.  The schedule window informs me that<br /> > I must enter a start date.  I do this
andit still does not recognize that<br /> > it has a date and will not activate the OK button even though there is
a<br/> > visible date in the field.  I have used the drop down in the field as well<br /> > as tried typing in
thedate with no luck.  One of my co-workers is having<br /> > the same problem and is running the same version
(1.8.4- however he is<br /> > running linux ).  The other co-worker is not having this problem and is<br /> >
runningversion 1.8.0 (linux ).  I tried to go back to 1.8.0(Windows); but,<br /> > was still unable to create a new
schedule. Thanks for your assistance<br /> > regarding this issue.<br /> ><br /><br /> It works for me on OS X,
thoughsomewhat annoyingly it seems to be<br /> using MM/DD/YYYY. If you modify another control after selecting the<br
/>date (ie. add a comment), does that allow it to recognise there's a<br /> date there?<br /><br /> -- <br /> Dave
Page<br/> EnterpriseDB UK:   http://www.enterprisedb.com<br /></font></tt><br /> 

pgadmin-support by date:

Previous
From: "Dave Page"
Date:
Subject: Re: pgadmin 1.8.4 pgagent schedule issue
Next
From: "Dave Page"
Date:
Subject: Re: pgadmin 1.8.4 pgagent schedule issue