Re: Switching timeline over streaming replication - Mailing list pgsql-hackers

From Amit Kapila
Subject Re: Switching timeline over streaming replication
Date
Msg-id 008901cd9c68$c9bc38e0$5d34aaa0$@kapila@huawei.com
Whole thread Raw
In response to Re: Switching timeline over streaming replication  (Josh Berkus <josh@agliodbs.com>)
Responses Re: Switching timeline over streaming replication  (Euler Taveira <euler@timbira.com>)
List pgsql-hackers
On Thursday, September 27, 2012 6:30 AM Josh Berkus wrote:
> >   Yes that is correct. I thought timeline change happens only when
> somebody
> > does PITR.
> >   Can you please tell me why we change timeline after promotion,
> because the
> > original
> >   Timeline concept was for PITR and I am not able to trace from code
> the
> > reason
> >   why on promotion it is required?
>
> The idea behind the timeline switch is to prevent a server from
> subscribing to a master which is actually behind it.  For example,
> consider this sequence:
>
> 1. M1->async->S1
> 2. M1 is at xid 2001 and fails.
> 3. S1 did not receive transaction 2001 and is at xid 2000
> 4. S1 is promoted.
> 5. S1 processed an new, different transaction 2001
> 6. M1 is repaired and brought back up
> 7. M1 is subscribed to S1
> 8. M1 is now corrupt.
>
> That's why we need the timeline switch.

Thanks.
I understood this point, but currently in documentation of Timelines, this usecase is not documented (Section 24.3.5).

With Regards,
Amit Kapila.




pgsql-hackers by date:

Previous
From: Kohei KaiGai
Date:
Subject: Re: [v9.3] Extra Daemons (Re: elegant and effective way for running jobs inside a database)
Next
From: Tom Lane
Date:
Subject: Re: Re: [WIP] Performance Improvement by reducing WAL for Update Operation