Re: special integrity constraints - Mailing list pgsql-sql

From Achilleus Mantzios
Subject Re: special integrity constraints
Date
Msg-id Pine.LNX.4.44.0403221212500.31407-100000@matrix.gatewaynet.com
Whole thread Raw
In response to special integrity constraints  (Erik Thiele <erik@thiele-hydraulik.de>)
Responses Re: special integrity constraints  (Erik Thiele <erik@thiele-hydraulik.de>)
List pgsql-sql
O kyrios Erik Thiele egrapse stis Mar 22, 2004 :

Did you check out the DEFERRABLE option on the constraint?

> hi,
> 
> i have two tables
> 
> create table a (x integer);
> create table b (y real);
> 
> i have the special constraint that the sum of the number of rows in
> table a plus the number of rows in table b must be even.
> 
> so there is a posibility of adding one element to a and one element to
> b, and again the constraint is met.
> 
> but this of course does not work, since between adding the element to a
> and adding the element to b, the constraint is not met.
> 
> so i cannot use a trigger.
> 
> what i need is the execution of a check procedure at commit time. is
> that somehow possible?
> 
> my database has much more tables than just a and b, and most time the other
> tables are modified and not a or b, so it would be nice to execute the
> constraint checking procedure only if a or b was modified.
> 
> yes :) this question i asked in my former mail too, but I think it
> looked like there was a workaround and my problem was wrong. so i
> created this new kind of problem here to make things clearer.
> 
> 
> cu
> Erik
> 
> 
> 

-- 
-Achilleus



pgsql-sql by date:

Previous
From: Erik Thiele
Date:
Subject: special integrity constraints
Next
From: Erik Thiele
Date:
Subject: Re: special integrity constraints