"Joshua D. Drake" <jd@commandprompt.com> writes:
> Robert Treat wrote:
>>>> If that is the case, we have likely solved nothing with our movement of
>>>> the dates to have 8.3 be a short cycle release.
>> If feature freeze is April 1st, and OSCon is July 24th, thats around
>> 4 months to get the release done. Given how things like the
>> buildfarm. and our theory that the new timeframe should help shorten
>> the release process, I don't think this is that unrealistic.
> That is kind of what I thought.
Josh is nowhere in line with what I thought the plan was. We're busting
our butts to have a short release cycle, and then we're going to piss it
all away after feature freeze? Nope. I thought we were hoping for
release June-ish, or worst case July-ish. A short devel cycle should
not need a slow test cycle.
regards, tom lane