Would it be possible to upgrade from 9.2 to 10 by doing a pg_basebackup
to the new server, followed by pg_upgrade -k, then streaming replication
from the 9.2 server to the 10 server until we're ready to cut over to 10?
The idea is to minimize downtime.
PJ